lean transformation
2015-01-02 19:50:03 3 举报
精益生产
作者其他创作
大纲/内容
square sub-cell
Toolmakers
Fit it together
material deliverd to receiving room
Parallel design and fabrication
two designers work on by 3D CAD at same time
Bellemare
unfinished part maket
Design the tool
A lot of adjustments and rework
Tool designer
bulletin board
transfer the information incorrly
milling/drilling sub-cell
the finished side of a rack
1.certain elements are desinging other parts are being built and fit into the frame2.save lots of time
1.fill out an online product form catians information
BOM
cross-function team meeting
adjacent milling /drilling sub-cell
receiving room
1.quality is buliding into the process2.writ one shop order for the entire project
Vendors
1.prioritizing work bombined with the streamlined tool design process2.bulletin board tracks performance
shape steel blocks to the precise dimensions in the square sub-cell
drafsman to finish details
CONCURRENT ENGINEERING
modularize the design and modularize the process steps
A product engineer
Fabricate the components
bar-code
put the part on the finished parts market
Group leaders
finished part maket