Material cycle system with Liw
2023-06-05 12:51:16 0 举报
Mind mapping for project control
作者其他创作
大纲/内容
Time
Mech Parts
Piping
Pump/screw conveyer
Platform
Electrical parts
Cabinet
Control switch
Product
Liw
Butterfly Valve
Target
What effect shall we would like to ahieve?
Show the display? Only show the material cycle?
Finished before 26th July
Runs smoothly without loud noise
Show our branding of BF & Liw
Components
Liw
What type shall we use?
Specs confirmation such as power, connection dims etc.
Butterfly Valve
How many?
What type?
Comfirm the lead time and make SchenckPo elements on the BF
Piping
How long shall we need?
What size?
Flexible & Transparent
Pump/Screw conveyer
Determine to which mechanism apply?
Noise should not be too loud
Where does it put? Support need?
Confirm if suitable for the power on exhibition
Air Tank
Get the info from Keke about the types provided by exhibition organizer
Specs confirmation
Service time confirmation
Platform
Dims confirmation based on the space of showroom
layout design for Logo, lights, cabinet & piping etc.
Electrical control system
Can the controller control 2 valves & 1 Liw?
Also control the pump/screw conveyer?
Design period
Parts purchasing lead time
Assy & tesing time
Cost
Belongs to R&D or sales?
Need to create IO#
As cheap as possible, make it by ourselves as much as possible
Others
Shipment time
Packing confirmation
protection type
fixing type
Safety consideration
BF cover
Ground connection
Assy & Testing
Disassembly & packing
Shipment
Assy & testing on site