光伏组件生产流程EN
2024-07-24 19:11:48 0 举报
光伏组件生产流程的前道环节是光伏产业的重要组成部分。在此过程中,硅片、电池片等核心部件经过切割、清洗、蚀刻等精密工序,为后续生产奠定了基础。前道生产的高效运作,对产品质量和性能具有决定性影响。因此,对前道生产进行严格管理和质量控制,是确保光伏组件高效、稳定运行的关键。
作者其他创作
大纲/内容
pre-wash
Frame assembly repair
laminating
EVA No. 2
A-level component
repair
box cover
Automatic tooling retrieval
大桶胶
Curing Room
Automatic Frame Assembly Machine
Beveling Machine
Line Scan AI Recognition
Laminate frame/corner guard placement
Repair completed
Recycle and tally waste materials
junction box
Repair based on abnormal issues
package
Data storage
Process according to the LCL consolidation rules.
Busbar Welding
Double Glass Sealing Edge Machine
Microscopic Examination EL
IV testing
border
Tail-end manual拼拖
Positioning tape
Serial repair
Test fixture reflow
Padding strip laying
Front glass
Glass machine
NG
typesetting machine
Wiring Box Installation
Safety compliance testing
Back glass
EVA
Edge sealing tape
Encapsulate the junction box with glue
Position the adhesive tape for sticking.
C-level component
Finished Goods Warehouse
Preparation room
MES grading
Solar
P-level component
Remove the lower pressure frame/ corner protector.
Sealant Dispensing Machine
busbar
Queue串NG
A course of EVA
scrap yard
Double-sided adhesive tape
Large Barrel Glue Pump
raw material storage
Automatic Gear Shifter
Welding and cutting integrated machine
scrap components
NG component
Wiring Box Soldering
Wiring Box Cover Installation
Automatic Corner Guard Machine
4H Curing
third-party review
Operations Planning Department
R-level component(Rework Component)
Frame Assembly Machine
Test fixture installation
Automatically weld the battery cells into a battery string.
Straighten the lead wire and take the PTFE cloth machine.
收藏
收藏
0 条评论
下一页